We have block work. Jerry the bricky has started the block work for the block and beam floor and outer skin. First brick below:
The man from building control, he say yes Thanks to the work of our groundworks team – we were ready today for the building control man to inspect the trenches. After a nervous wait, we now have the go ahead to pour concrete tomorrow.